Timeline

Where the build
actually is.

We came together in late March 2026. Since then: scope locked, a full sensor pod designed, fabbed, hand-assembled, and killed. We're on the second design now, and we're in gyms asking trainers what belongs on the report before we build it.

// Roadmap ● You are here
Mar '26
Origin
Apr '26
Scope Locked
May–Jul '26
First Pod, Built and Killed
Now
Second Design + Trainer Sessions
Next
First On-Body Sessions
● Status

The first design is dead.
We're building the second.

We designed a sensor pod, had it fabbed, assembled the radio module by hand, and lost the last working board in July. That generation is finished. What it left behind is a schematic we understand, a component set already sourced and in-house, and a specific list of what the next board changes, which is what the second design is being drawn from.

While that's in respin, we're in gyms. We're asking trainers what they already tell parents, what they watch for mid-session, and what would actually be worth reading on a one-page report. We'd rather build that page off what trainers say than off what we assume.

No academy gets a start date until one full session runs end to end on a real arm: record, offload, report in a parent's hands. That's the standard we're holding ourselves to, and it's why this page shows gates instead of promised months.

// Milestones

The full roadmap.

Late March 2026
Complete

Origin

Karl, Ryan, and Kai come together around a shared idea: a youth basketball performance tracker priced for the people who train youth basketball. Three founders, one thesis: the analytics pro teams pay for shouldn't be the only option for the next generation of basketball.

April 2026
Complete

Scope locked

Basketball-first scope committed. Session Load Score defined as the hero metric. Upper-arm compression sleeve locked as the form factor, the cultural fit for basketball. Ryan and Kai deep into PCB design, schematics, and firmware. Aaron driving trainer and coach outreach across Los Angeles, Orange and San Diego counties.

May–July 2026
Complete

First pod, built and killed

PCB designed and fabbed at JLCPCB. Boards came back, the radio module went on by hand, and the last working board died in July. Four months from schematic to a dead board on the bench. That wasn't the plan. It's still the fastest way we could have learned what the next board has to change, and we'd rather find it now than in someone's gym.

Now
In Progress

Second design + trainer sessions

Two things running at once. Ryan and Kai are on a new schematic and board layout. Karl is in gyms asking trainers how they talk to parents today, what they watch for in a kid mid-session, and what they'd actually put on a page that goes home. The second design gets built against those answers instead of our guesses.

Next
Upcoming

First on-body sessions

Adults wear the pod first. The full loop, timed: session, data off the pod, report in a parent's hands.

We're asking trainers
what belongs on the page.

We drive to gyms across Los Angeles, Orange and San Diego counties. If you run sessions, we want to sit in on one and ask what belongs on the report. The report gets built off what trainers actually tell us.

Invite us to a session →